Insights, embeds predesigned PowerBI dashboards to offer and enable clear, real-time operational risk and compliance management.

The Current Tasks dashboard provides visually clean and insightful data visualisations on Current Open and Overdue Tasks across all modules.

  1. Click into Insights along the top ribbon menu.

  2. Navigate to the drop down list of dashboard options in the top left corner. Select Current Tasks.

  3. Once the default view of the Current Tasks dashboard has loaded, a summary breakdown of the number of Current Open Tasks by Overdue/Not Overdue status will appear along the top, followed by a graphical breakdown by Positions, Modules and Due Dates.

    ℹ️ Visual graphs on the dashboards are interactive and thus, any filter selected on one graph will apply across all graphs on the dashboard.

  4. To apply specific filters across the entire dashboard, access the Advanced Filters panel collapsed along the very right side. Click on the Advanced Filters panel to reveal it.

  5. Using the list of Advanced Filters available, select what you'd like to filter by e.g. by specific module, whether overdue or by a specific group of task assignees/actioners (that make up a team/business unit).

    ℹ️ Multiple advanced filters can be applied to the dashboard.

    e.g. Example below shows advanced filtering by Risk-related tasks ie. Risk Reviews and Risk Treatment Tasks.

  6. With a right click on any of the summary numbers or visual graphs, you can select a Drill Through option to see more details on the particular data. The dashboard will take you to a grid view that provides a high-level summary overview of all critical details (fields) associated to that Task.

    ℹ️ Record numbers are underlined to indicate hyperlinking to the Task's parent record. By clicking on the record number, it will drill through and take the user straight to the record for quick access.

  7. The high-level summary grid view can be exported. By hovering over the top right corner of the dashboard, select the ellipsis that appear. By clicking on the ellipsis, you will be presented with a list of options, including the Export data option.


    • Related Articles

    • What happens when a Task is Overdue?

      If a Current Task remains open and incomplete beyond it's Due Date, this Task becomes an Overdue Task and the following occurs: The Escalation Point (either of the task assignee - default, or specifically selected escalation point for the task) will ...
    • Viewing KRI History

      If KRI Measurements have been loaded via spreadsheet, or if KRI Tasks have been completed for the selected KRI, history records will exist for the this KRI and the Show Task History icon will display in the Measurement tab. Open the KRI you wish to ...
    • How to change the Due Date of a Current Open Task

      Are you looking to change the Due Date of a Current Open Task on a user's My Summary Page? Our system provides the capability to change the due date of a current open task to provide flexibility and facilitate any timeline changes approved by your ...
    • What are my Current Tasks?

      A Current Task is generated from a task on a scheduled date, and is required to be completed by the Actioned By’s 1 Position. A Position’s 1 Current Tasks are listed on the Current Task tab of the My Summary page. From the Main Menu select My ...
    • Temporarily Reallocate Future Tasks

      Temporary tasks allocations can be done in the case when the user is on leave and you want to allocate another user to take care of the tasks in their absence. Please read the instructions below on how to reallocate the task and how to cancel it when ...