Update Task Completion History

Update Task Completion History

Note: Only Positions that completed this task, or have been allocated to a Security Group with ‘Edit’ Record Security Rights can update a Process Control’s Completed Task History record.

  1. Open the Task Completion History window. Click the ‘Update History’ 1 icon.

  2. The ‘Update Task Completion History’ window displays. Enter a Reason 1 for the update in the Reason field. Change the ‘Actioned On’ 2 date if required. If the Outcome 3 for this task can be set to ‘Yes/No’ or ‘Pass/Fail’, this will display and you will be able to change the choice. Click the Save 4 icon to Update. Click the Cancel 5 icon to cancel the Update and close this window. Saved Updates will appear on the Comments tab.
    (Note:Depending on your system configuration, ‘Completed’ options may appear. Serious consideration needs to be given to ever changing this answer to ‘No’, as ‘No’ means this task will not ever be completed; it will be ‘Not Completed’.)

  3. If required, Click the Comments tab. Click Add Comments 1 icon to add new comments.

  4. The Add New Comment window displays. Enter a new Comment 1. Click the Save 2 icon to save this comment. (Click the Cancel 3 to cancel the save and close this window.)

  5. To edit a Comment, click the Edit icon 1.

  6. The Edit Comment window displays. Update the comment 1. Click the Click the Save 2 icon to save this comment.

  7. To delete a Comment, Click the Delete 1 icon. Click OK to confirm the delete.

  8. If required, click the Attachments tab. Drop the attachment files, or use Browse. The file(s) will remain displayed in the field before disappearing and reappearing in the Attachments list.

  9. Click the View 1 icon to view the attachment. Click the Delete 2 to delete the attachment.



    • Related Articles

    • View Task Completion History

      The ‘Show the Task Completion History’ icon only appears for those Process Controls that have completed task(s). Note: Only Positions allocated to a Security Group with ‘View’ or ‘Edit’ Record Security Rights can view a Process Control’s Task ...
    • Update KRI History

      To update a KRI History record, a Position must be a member of a Security Group with Edit access to that record. The updating of the History record is done separately on each of the tabs. Select the KRI History record to be updated. As required: ...
    • Viewing KRI History

      If KRI Measurements have been loaded via spreadsheet, or if KRI Tasks have been completed for the selected KRI, history records will exist for the this KRI and the Show Task History icon will display in the Measurement tab. Open the KRI you wish to ...
    • View Attestation Completion History

      View Attestation Completion History The ‘Attestation History’ icon only appears for Attestation’s that Accepted or ‘Will not be Complete’. If no Attestations have these Statuses, the History icon will not appear. Note: Only Positions with membership ...
    • Reviewing Accountability Sign-off task history

      A user can review their Sign-off Task history via: (1) Accountability Sign-off History Icon; or (2) ‘Accountability Sign-off Task’ Icon Via ‘Accountability Sign-off History’ Icon From the Main Menu, select SMCR/Accountable People and select your ...