Adding (Scheduling) the KRI Task

Adding (Scheduling) the KRI Task

Adding (Scheduling) the KRI Task

The KRI’s purpose is to record each measure as required. So, unlike a Compliance Process which can have multiple Process Control tasks, the KRI only has one task, record the measurement. Hence, the Task tab only allows the scheduling of a single task, the task to record this measurement.

Historical measures can be loaded via spreadsheet (regardless of the Load values setting). Or, Historical measures can be loaded manually by setting the scheduling to first date you have a measure for. The Monitor will generate all preceding task for measurements to recorded into. Please contact your administrator (first), or Drova GRC support if you require further information.

  1. Create or Edit the KRI you wish to schedule. Click the Task tab.


    See KRI Task tab elements for more information on each field.

  2. Decide if the measurement is to be recorded via a Current task, or to be loaded from a spreadsheet (1). Choosing the spreadsheet option means only the first reminder email is generated and the values must be loaded via spreadsheet. Since there is no task, there is no Overdue concept, nor second reminder with this option. Not choosing this option means that as per normal, the task is generated on the reminder date, can have a second reminder, and can become overdue, and the measurement must be entered in this generated current task.

  3. Enter the description or instructions (2) required to complete the measurement. These details are emailed to the ‘Actioned By’ Position on the first reminder date.

  4. Enter the scheduling details (3). The frequency is measured in months; e.g. use 12 for yearly.

  5. Select the ‘Owner’ as the ‘Escalate To’ (4) to ensure the ‘Owner’ is notified if the measure is not recorded by the Due date.

  6. To appear in ‘Actioned By’ a Position must belong to a Security Group that has View or Edit access to this KRI record. Only one Position can record a measurement. Select the Position to record this measurement (5).

  7. Click the menu icon (6) and click Save to save your changes. The Monitor will generate notifications at the scheduled times.


    • Related Articles

    • Selecting a KRI indicator and periodic scheduling

      From this article, you will learn about: 4 different KRI Indicator types: upper limit, lower limit, range and manual KRI limit types Periodic scheduling of KRIs Different KRI Indicator types You can select from 4 different KRI Indicators, depending ...
    • GRC KRIs

      From this article, you will learn about: What a Key Risks Indicator (KRI) is What the KRIs feature is used for Examples of KRIs KRI links to other modules Key Risk Indicators (KRIs) are metrics used to measure Risk. Any piece of data that can perform ...
    • Completing a KRI Task

      Note: The term KRI is configurable within Drova and may be called something different within your organisation. If you are unsure, speak to your site administrator. Complete a KRI Task via your ‘My Summary’ Page: Identify the KRI Task in the ‘Current ...
    • How to Add a KRI?

      Note: To create a KRI, a Position must be a member of one of the following System Security Groups: Create KRI, KRI Administrator, Administrator. A new KRI can be added from: The KRI list page The KRI page To add from the KRI list page: Click the New ...
    • Add, Edit, Delete a Note in a KRI Record

      The Notes tab displays a list of Notes that have been added to this KRI record. This tab can be used to add any relevant information relating to the KRI record as required. Positions with View or Edit access are permitted to add Notes. Positions with ...